Home |
News | New, Powerful Smart Meter Verification Released
New, Powerful Smart Meter Verification Released
April 01, 2010
-
No measurement interruption during operation
-
Programmable scheduling option to initiate automatic operation (1 to 1000 hour increments).
-
Automatic operation based on process thresholds.
-
Last 20 results stored in the transmitter for future viewing or downloading.
-
Unique and patented method that checks the ENTIRE flow measurement system – sensor, electronics, etc. – don’t be fooled by labour-intensive imitations.
-
Increase uptime by allowing verification without process interruption or measurement interruption.
-
Eliminate uncertainty by providing rapid and complete feedback whenever it is needed with NO impact.
-
Improve quality by always knowing the condition of the flow measurement and by avoiding process interference.
-
Reduce costs by reducing or eliminating unnecessary services to check or calibrate meters.
-
Combine with Smart Wireless for the most powerful plant‐wide verification process.
Click here for Emerson’s brochure.