New, Powerful Smart Meter Verification Released

April 01, 2010

  • No measurement interruption during operation
  • Programmable scheduling option to initiate automatic operation (1 to 1000 hour increments).
  • Automatic operation based on process thresholds.
  • Last 20 results stored in the transmitter for future viewing or downloading.
  • Unique and patented method that checks the ENTIRE flow measurement system – sensor, electronics, etc. – don’t be fooled by labour-intensive imitations.
  • Increase uptime by allowing verification without process interruption or measurement interruption.
  • Eliminate uncertainty by providing rapid and complete feedback whenever it is needed with NO impact.
  • Improve quality by always knowing the condition of the flow measurement and by avoiding process interference.
  • Reduce costs by reducing or eliminating unnecessary services to check or calibrate meters.
  • Combine with Smart Wireless for the most powerful plant‐wide verification process.

Click here for Emerson’s brochure.